Indian Prime Minister Narendra Modi announced a development cooperation package of 240 billion Nepali rupees (approximately 150 billion Indian rupees) for Nepal on November 23, 2026. The announcement was made during a joint press conference held during the visit of Prime Minister Balen Shah to India.
The aid package is designated for reconstruction efforts in the aftermath of the Bhote Koshi flood and for infrastructure projects, including the construction of the Butwal-Pokhara Expressway.
Background
- India has been providing economic and technical assistance to Nepal since 1951.
During bilateral talks held in New Delhi on November 22 and 23, 2026, Prime Minister Modi reiterated India’s commitment to supporting Nepal during both good and difficult times.
Background to the Aid Package
Nepal had previously requested an economic package of 2 billion US dollars, including 1 billion dollars in grants, for the reconstruction of areas affected by the Bhote Koshi flood. Nepal had also formally requested financial assistance from India amounting to 200 billion Indian rupees, comprising 100 billion rupees in concessional loans and 100 billion rupees in grants.
While India announced a loan component aligned with Nepal’s request, the grant amount appears to have been reduced. The exact breakdown of the announced 240 billion Nepali rupees package into concessional loans and grants has not been officially clarified. However, sources suggest it includes approximately 100 billion Indian rupees in concessional loans and 50 billion Indian rupees in grants.
Reconstruction and Infrastructure Projects
The 240 billion Nepali rupees aid package is earmarked for projects such as the reconstruction following the Bhote Koshi flood and the development of the Butwal-Pokhara Expressway.
The Bhote Koshi River experienced a devastating flood on August 26, 2026 (Kartik 10 BS), causing significant loss of life and property. According to the National Disaster Risk Reduction and Management Authority, 1,331 bodies have been recovered to date, with 5,000 individuals still missing. This aid is expected to accelerate reconstruction activities in the flood-affected regions.
In a separate development, Nepal had previously cancelled a loan agreement worth approximately 900 million US dollars due to underutilization. This was part of a 1 billion dollar aid package announced by India during Prime Minister Modi’s visit in 2014, of which only 50 million dollars were disbursed from the 750 million dollar loan component. India has been involved in over 573 high-impact community development projects in Nepal since 2003.
Next Steps for the Butwal-Pokhara Expressway
Twenty-seven consulting firms have expressed interest in preparing the detailed project report (DPR) for the Butwal-Pokhara Expressway. The Department of Roads will shortlist the top six firms to request detailed proposals.
Upon completion of the DPR, the final design of the road, necessary infrastructure, and estimated costs will be determined. Based on this, the government will decide on the most suitable option and proceed with the highway upgrade process. The government aims to complete the necessary studies, preparatory work, and other procedures for the highway’s expansion within the next fiscal year, with the goal of commencing construction the year after, following a decision on whether to build an expressway or widen the existing Siddhartha Highway.
A ‘Nepal-India Joint Vision’ is scheduled to be unveiled on November 23, 2026.
What happens next
The Department of Roads will shortlist six consulting firms to prepare the detailed project report for the Butwal-Pokhara Expressway, with the government aiming to commence construction within the next two years after finalising the project's scope.